Notice board
What the business is telling its staff this month.
Aisle B racking: reduced access until inspection sign-off
Following the forklift strike on 5 September, bays B-12 to B-16 are closed to forklift traffic until the racking supplier signs off the repaired upright. Pick from the alternative bays shown on your scanner. Forklift FL-11 remains tagged out. Report any further contact with racking immediately, no matter how minor.
8 September 2026
Heat season and chilled chamber rotation
With warmer weather from October, chilled chamber work will move to twenty minutes in, ten minutes out rotations and water will be available at every dock. Drivers must check reefer set points before departure and record the temperature on the consignment note. See the goods receival procedure for probe thermometer checks.
10 September 2026
Chain of Responsibility refresher for allocators and loaders
All allocators, loaders and team leaders will attend a ninety minute Chain of Responsibility refresher on 22 September in the training room. The session covers mass and load restraint checks, realistic scheduling and how to record a refused load. Attendance is recorded on the training matrix.
12 September 2026
Welcome to our three new apprentice supply chain operators
Three new supply chain operations trainees start on the day shift at Dandenong South on 21 September. They will be supervised for their first five shifts under the forklift and traffic procedure and will rotate through receiving, picking and despatch over twelve weeks. Please make them welcome and show them how we do things here.
14 September 2026
Evacuation drill, Dandenong South afternoon shift
An unannounced evacuation drill will take place on the afternoon shift during the week of 5 October. Wardens will sweep their areas and the assembly point is the north car park beside the weighbridge. Forklift operators must lower forks, switch off and remove keys. A debrief will follow at the next toolbox talk.
16 September 2026