Scenario · Rail and Intermodal Terminal

Gate in and load a container for the Perth rail service

You are a Terminal Operator at the Altona North rail intermodal terminal.

Intermediate2 to 3 hours8 tasks
Home/Scenarios/Gate in and load a container for the Perth rail service
The situation

What has happened

A forty foot container for Tallowood Timber Supplies, booked as CN-260906-0002, arrives by road on Saturday morning for the Perth service with a cut-off of 4:00 pm. Reach stacker RS-02 is in the workshop with a hydraulic leak, so the lift must be planned with RS-01. Last week a terminal tractor driver entered the siding before the train had stopped, which is recorded as INC-2026-0138 with actions still open, and the Terminal Manager wants the corridor access rules followed to the letter. The container must be gate checked, recorded, staged and lifted onto the correct wagon position before the train is released.

Your brief. Complete the container cycle from gate in to wagon loading safely and accurately: check the container and seal, record it, plan the lift with the available reach stacker, apply the rail corridor access rules during the lift, and update the consignment record so that the rail operator and the customer can see the box is on the train.
Read the work request in your inbox
Tasks

Deliverables

  • Updated consignment record showing gate in, seal check, wagon and load time
  • RS-01 pre-start record in the fleet register
  • Written lift plan with exclusion zones and siding access steps
  • Any incident register entries raised during the shift
For trainers and assessors

Units of competency

Current on training.gov.au for the Transport and Logistics Training Package as at 10 September 2026.

TLIA0017Process receipt and delivery of containers and cargo
TLIA0013Maintain container and freight records
TLIB3118Apply awareness of railway fundamentals
TLIF3087Follow work health and safety, and environmental procedures in the rail industry
TLIF0020Safely access the rail corridor

Qualifications

TLI32821Certificate III in Rail Operations
TLI30325Certificate III in Supply Chain Operations
Assessor notes

What to look for

Evidence guide

Look for a seal and condition check recorded before the container moves, a lift plan that names the exclusion zones and the confirmation step before entering the siding, and a pre-start record for the reach stacker. The consignment record must show the train, wagon and load time, and the student should show awareness of the recent breach in how they plan the siding access.

The student's evidence summary lists every record they created or changed in the systems named above, their notes and the tasks they ticked. Verify it against the deliverables and your own assessment tool.